Building Permits
Switzerland
Duration
12 – 20 weeks
Paperwork Mountain
Drawings Required
70%
Permit Headache
TIPS
- Building Code varies between cantons therefore it’s important to check that the correct version of the regulations is being followed.
DID YOU KNOW?
- In some regions, applications for signage will need to be granted in conjunction with agreed local taxation for the right to display.
- Cooling power allowances are very stringent in Geneva where in some locations, air conditioning systems must make use of water cooled by Lake Geneva.
Any questions? Don’t hesitate to contact us.
The previous info is intended as broad guidance – every site varies. Contact Wayne for tailored permitting advice relating to Switzerland.
-